Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGCattle Shed
0.2%
OF COST SPENT
₹2.43 L spent
of ₹11.72 Cr sanctioned
₹11.69 Cr still to spend
on 249 ongoing works
Works ongoing
249
Open the list of these works →
Sanctioned
₹11.72 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.43 L
0.2% of sanction
Balance cost (unspent)
₹11.69 Cr
Wage₹1.41 Cr
Material₹10.28 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost