Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
54.2%
OF COST SPENT
₹80.89 L spent
of ₹1.49 Cr sanctioned
₹68.37 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹1.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹80.89 L
54.2% of sanction
Balance cost (unspent)
₹68.37 L
Wage₹34.24 L
Material₹34.13 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh