Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
24.7%
OF COST SPENT
₹24.80 L spent
of ₹1.00 Cr sanctioned
₹75.57 L still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹1.00 Cr
Pure scheme (wage + material)
Expenditure since inception
₹24.80 L
24.7% of sanction
Balance cost (unspent)
₹75.57 L
Wage₹38.98 L
Material₹36.60 L