Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
4.7%
OF COST SPENT
₹21.12 L spent
of ₹4.54 Cr sanctioned
₹4.33 Cr still to spend
on 50 ongoing works
Works ongoing
50
Open the list of these works →
Sanctioned
₹4.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.12 L
4.7% of sanction
Balance cost (unspent)
₹4.33 Cr
Wage₹1.62 Cr
Material₹2.70 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore