Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
7.6%
OF COST SPENT
₹3.13 L spent
of ₹41.16 L sanctioned
₹38.03 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹41.16 L
Pure scheme (wage + material)
Expenditure since inception
₹3.13 L
7.6% of sanction
Balance cost (unspent)
₹38.03 L
Wage₹26.83 L
Material₹11.21 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh