Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
46.9%
OF COST SPENT
₹6.99 L spent
of ₹14.88 L sanctioned
₹7.90 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹14.88 L
Pure scheme (wage + material)
Expenditure since inception
₹6.99 L
46.9% of sanction
Balance cost (unspent)
₹7.90 L
Wage₹3.29 L
Material₹4.60 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type