Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Canal
67.1%
OF COST SPENT
₹1.45 Cr spent
of ₹2.16 Cr sanctioned
₹70.99 L still to spend
on 37 ongoing works
Works ongoing
37
Open the list of these works →
Sanctioned
₹2.16 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.45 Cr
67.1% of sanction
Balance cost (unspent)
₹70.99 L
Wage₹17.19 L
Material₹53.79 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore