Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
37%
OF COST SPENT
₹36.22 L spent
of ₹97.93 L sanctioned
₹61.71 L still to spend
on 15 ongoing works
Works ongoing
15
Open the list of these works →
Sanctioned
₹97.93 L
Pure scheme (wage + material)
Expenditure since inception
₹36.22 L
37% of sanction
Balance cost (unspent)
₹61.71 L
Wage₹47.05 L
Material₹14.66 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh