Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Play field
82.7%
OF COST SPENT
₹1.91 Cr spent
of ₹2.31 Cr sanctioned
₹39.97 L still to spend
on 28 ongoing works
Works ongoing
28
Open the list of these works →
Sanctioned
₹2.31 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.91 Cr
82.7% of sanction
Balance cost (unspent)
₹39.97 L
Wage₹19.60 L
Material₹20.36 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore