Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
26.4%
OF COST SPENT
₹1.18 Cr spent
of ₹4.47 Cr sanctioned
₹3.29 Cr still to spend
on 175 ongoing works
Works ongoing
175
Open the list of these works →
Sanctioned
₹4.47 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.18 Cr
26.4% of sanction
Balance cost (unspent)
₹3.29 Cr
Wage₹2.49 Cr
Material₹80.23 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore