Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.1%
OF COST SPENT
₹1.23 L spent
of ₹23.67 Cr sanctioned
₹23.66 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹23.67 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.23 L
0.1% of sanction
Balance cost (unspent)
₹23.66 Cr
Wage₹12.51 Cr
Material₹11.14 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore