Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
6.6%
OF COST SPENT
₹1.19 Cr spent
of ₹18.09 Cr sanctioned
₹16.90 Cr still to spend
on 151 ongoing works
Works ongoing
151
Open the list of these works →
Sanctioned
₹18.09 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.19 Cr
6.6% of sanction
Balance cost (unspent)
₹16.90 Cr
Wage₹8.55 Cr
Material₹8.35 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore