Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
17.5%
OF COST SPENT
₹5.02 L spent
of ₹28.65 L sanctioned
₹23.63 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹28.65 L
Pure scheme (wage + material)
Expenditure since inception
₹5.02 L
17.5% of sanction
Balance cost (unspent)
₹23.63 L
Wage₹16.82 L
Material₹6.81 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh