Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Gabion
4.3%
OF COST SPENT
₹2.18 L spent
of ₹50.56 L sanctioned
₹48.38 L still to spend
on 31 ongoing works
Works ongoing
31
Open the list of these works →
Sanctioned
₹50.56 L
Pure scheme (wage + material)
Expenditure since inception
₹2.18 L
4.3% of sanction
Balance cost (unspent)
₹48.38 L
Wage₹3.02 L
Material₹45.37 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh