Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.3%
OF COST SPENT
₹8.56 L spent
of ₹31.87 Cr sanctioned
₹31.78 Cr still to spend
on 234 ongoing works
Works ongoing
234
Open the list of these works →
Sanctioned
₹31.87 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.56 L
0.3% of sanction
Balance cost (unspent)
₹31.78 Cr
Wage₹14.53 Cr
Material₹17.25 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore