Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Gabion
38.5%
OF COST SPENT
₹80.62 L spent
of ₹2.09 Cr sanctioned
₹1.29 Cr still to spend
on 69 ongoing works
Works ongoing
69
Open the list of these works →
Sanctioned
₹2.09 Cr
Pure scheme (wage + material)
Expenditure since inception
₹80.62 L
38.5% of sanction
Balance cost (unspent)
₹1.29 Cr
Wage₹50.46 L
Material₹78.15 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore