Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of NADEP/Vermi Compost Pit
3.7%
OF COST SPENT
₹1.82 L spent
of ₹48.93 L sanctioned
₹47.10 L still to spend
on 134 ongoing works
Works ongoing
134
Open the list of these works →
Sanctioned
₹48.93 L
Pure scheme (wage + material)
Expenditure since inception
₹1.82 L
3.7% of sanction
Balance cost (unspent)
₹47.10 L
Wage₹10.11 L
Material₹37.00 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh