Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
6.2%
OF COST SPENT
₹68,136 spent
of ₹10.95 L sanctioned
₹10.27 L still to spend
on 19 ongoing works
Works ongoing
19
Open the list of these works →
Sanctioned
₹10.95 L
Pure scheme (wage + material)
Expenditure since inception
₹68,136
6.2% of sanction
Balance cost (unspent)
₹10.27 L
Wage₹8.04 L
Material₹2.23 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh