Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
16.2%
OF COST SPENT
₹2.14 Cr spent
of ₹13.18 Cr sanctioned
₹11.04 Cr still to spend
on 645 ongoing works
Works ongoing
645
Open the list of these works →
Sanctioned
₹13.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.14 Cr
16.2% of sanction
Balance cost (unspent)
₹11.04 Cr
Wage₹8.22 Cr
Material₹2.82 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore