Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
59.1%
OF COST SPENT
₹1.53 Cr spent
of ₹2.59 Cr sanctioned
₹1.06 Cr still to spend
on 28 ongoing works
Works ongoing
28
Open the list of these works →
Sanctioned
₹2.59 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.53 Cr
59.1% of sanction
Balance cost (unspent)
₹1.06 Cr
Wage₹27.40 L
Material₹78.38 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore