Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2.5%
OF COST SPENT
₹12.82 L spent
of ₹5.13 Cr sanctioned
₹5.00 Cr still to spend
on 67 ongoing works
Works ongoing
67
Open the list of these works →
Sanctioned
₹5.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.82 L
2.5% of sanction
Balance cost (unspent)
₹5.00 Cr
Wage₹1.20 Cr
Material₹3.81 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore