VBGRAMGConstruction of Crematorium
0%
OF COST SPENT
₹600 spent
of ₹43.52 L sanctioned
₹43.51 L still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹43.52 L
Pure scheme (wage + material)
Expenditure since inception
₹600
0% of sanction
Balance cost (unspent)
₹43.51 L
Wage₹7.07 L
Material₹36.44 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown