Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
82.7%
OF COST SPENT
₹2.54 Cr spent
of ₹3.07 Cr sanctioned
₹52.90 L still to spend
on 17 ongoing works
Works ongoing
17
Open the list of these works →
Sanctioned
₹3.07 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.54 Cr
82.7% of sanction
Balance cost (unspent)
₹52.90 L
Wage₹8.96 L
Material₹43.93 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh