Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.3%
OF COST SPENT
₹26.01 L spent
of ₹94.54 Cr sanctioned
₹94.28 Cr still to spend
on 2,745 ongoing works
Works ongoing
2,745
Open the list of these works →
Sanctioned
₹94.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹26.01 L
0.3% of sanction
Balance cost (unspent)
₹94.28 Cr
Wage₹40.47 Cr
Material₹53.81 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore