Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
37.3%
OF COST SPENT
₹10.41 Cr spent
of ₹27.90 Cr sanctioned
₹17.49 Cr still to spend
on 501 ongoing works
Works ongoing
501
Open the list of these works →
Sanctioned
₹27.90 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.41 Cr
37.3% of sanction
Balance cost (unspent)
₹17.49 Cr
Wage₹13.50 Cr
Material₹3.98 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore