Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
85.2%
OF COST SPENT
₹24.07 L spent
of ₹28.24 L sanctioned
₹4.17 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹28.24 L
Pure scheme (wage + material)
Expenditure since inception
₹24.07 L
85.2% of sanction
Balance cost (unspent)
₹4.17 L
Wage₹87,986
Material₹3.29 L