Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
5.3%
OF COST SPENT
₹58,526 spent
of ₹11.08 L sanctioned
₹10.50 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹11.08 L
Pure scheme (wage + material)
Expenditure since inception
₹58,526
5.3% of sanction
Balance cost (unspent)
₹10.50 L
Wage₹5.59 L
Material₹4.91 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh