Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
34.6%
OF COST SPENT
₹1.92 Cr spent
of ₹5.54 Cr sanctioned
₹3.63 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹5.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.92 Cr
34.6% of sanction
Balance cost (unspent)
₹3.63 Cr
Wage₹83.21 L
Material₹2.79 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost