Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
73.2%
OF COST SPENT
₹91.35 L spent
of ₹1.25 Cr sanctioned
₹33.50 L still to spend
on 20 ongoing works
Works ongoing
20
Open the list of these works →
Sanctioned
₹1.25 Cr
Pure scheme (wage + material)
Expenditure since inception
₹91.35 L
73.2% of sanction
Balance cost (unspent)
₹33.50 L
Wage₹19.13 L
Material₹14.37 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh