Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.4%
OF COST SPENT
₹7.29 L spent
of ₹19.77 Cr sanctioned
₹19.70 Cr still to spend
on 145 ongoing works
Works ongoing
145
Open the list of these works →
Sanctioned
₹19.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.29 L
0.4% of sanction
Balance cost (unspent)
₹19.70 Cr
Wage₹12.70 Cr
Material₹7.00 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost