Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
39.9%
OF COST SPENT
₹7.48 Cr spent
of ₹18.75 Cr sanctioned
₹11.27 Cr still to spend
on 144 ongoing works
Works ongoing
144
Open the list of these works →
Sanctioned
₹18.75 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.48 Cr
39.9% of sanction
Balance cost (unspent)
₹11.27 Cr
Wage₹4.63 Cr
Material₹6.64 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr