Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
68%
OF COST SPENT
₹1.27 Cr spent
of ₹1.86 Cr sanctioned
₹59.51 L still to spend
on 15 ongoing works
Works ongoing
15
Open the list of these works →
Sanctioned
₹1.86 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.27 Cr
68% of sanction
Balance cost (unspent)
₹59.51 L
Wage₹29.75 L
Material₹29.76 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh