Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
27%
OF COST SPENT
₹1.01 Cr spent
of ₹3.73 Cr sanctioned
₹2.72 Cr still to spend
on 61 ongoing works
Works ongoing
61
Open the list of these works →
Sanctioned
₹3.73 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.01 Cr
27% of sanction
Balance cost (unspent)
₹2.72 Cr
Wage₹2.06 Cr
Material₹66.02 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore