Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
1.1%
OF COST SPENT
₹1.30 Cr spent
of ₹116.93 Cr sanctioned
₹115.63 Cr still to spend
on 4,115 ongoing works
Works ongoing
4,115
Open the list of these works →
Sanctioned
₹116.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.30 Cr
1.1% of sanction
Balance cost (unspent)
₹115.63 Cr
Wage₹56.80 Cr
Material₹58.83 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block