Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
42%
OF COST SPENT
₹2.58 Cr spent
of ₹6.13 Cr sanctioned
₹3.56 Cr still to spend
on 194 ongoing works
Works ongoing
194
Open the list of these works →
Sanctioned
₹6.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.58 Cr
42% of sanction
Balance cost (unspent)
₹3.56 Cr
Wage₹98.05 L
Material₹2.58 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh