Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
38.6%
OF COST SPENT
₹3.41 Cr spent
of ₹8.83 Cr sanctioned
₹5.42 Cr still to spend
on 138 ongoing works
Works ongoing
138
Open the list of these works →
Sanctioned
₹8.83 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.41 Cr
38.6% of sanction
Balance cost (unspent)
₹5.42 Cr
Wage₹2.02 Cr
Material₹3.41 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore