Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
63.5%
OF COST SPENT
₹1.61 Cr spent
of ₹2.53 Cr sanctioned
₹92.47 L still to spend
on 137 ongoing works
Works ongoing
137
Open the list of these works →
Sanctioned
₹2.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.61 Cr
63.5% of sanction
Balance cost (unspent)
₹92.47 L
Wage₹51.32 L
Material₹41.14 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore