Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.4%
OF COST SPENT
₹1.96 L spent
of ₹5.33 Cr sanctioned
₹5.31 Cr still to spend
on 245 ongoing works
Works ongoing
245
Open the list of these works →
Sanctioned
₹5.33 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.96 L
0.4% of sanction
Balance cost (unspent)
₹5.31 Cr
Wage₹3.72 Cr
Material₹1.59 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore