Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.6%
OF COST SPENT
₹4.54 L spent
of ₹8.04 Cr sanctioned
₹8.00 Cr still to spend
on 142 ongoing works
Works ongoing
142
Open the list of these works →
Sanctioned
₹8.04 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.54 L
0.6% of sanction
Balance cost (unspent)
₹8.00 Cr
Wage₹5.74 Cr
Material₹2.26 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore