Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
31.8%
OF COST SPENT
₹2.89 Cr spent
of ₹9.08 Cr sanctioned
₹6.19 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹9.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.89 Cr
31.8% of sanction
Balance cost (unspent)
₹6.19 Cr
Wage₹94.24 L
Material₹5.24 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore