Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
70.1%
OF COST SPENT
₹9.91 L spent
of ₹14.13 L sanctioned
₹4.22 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹14.13 L
Pure scheme (wage + material)
Expenditure since inception
₹9.91 L
70.1% of sanction
Balance cost (unspent)
₹4.22 L
Wage₹23,798
Material₹3.99 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh