Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
47.3%
OF COST SPENT
₹4.52 Cr spent
of ₹9.54 Cr sanctioned
₹5.02 Cr still to spend
on 127 ongoing works
Works ongoing
127
Open the list of these works →
Sanctioned
₹9.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.52 Cr
47.3% of sanction
Balance cost (unspent)
₹5.02 Cr
Wage₹3.08 Cr
Material₹1.94 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore