Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
77.8%
OF COST SPENT
₹1.23 Cr spent
of ₹1.58 Cr sanctioned
₹35.04 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹1.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.23 Cr
77.8% of sanction
Balance cost (unspent)
₹35.04 L
Wage₹14.54 L
Material₹20.50 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh