Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
40.4%
OF COST SPENT
₹83.93 Cr spent
of ₹207.73 Cr sanctioned
₹123.80 Cr still to spend
on 11,943 ongoing works
Works ongoing
11,943
Open the list of these works →
Sanctioned
₹207.73 Cr
Pure scheme (wage + material)
Expenditure since inception
₹83.93 Cr
40.4% of sanction
Balance cost (unspent)
₹123.80 Cr
Wage₹67.43 Cr
Material₹56.37 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown