Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
71.9%
OF COST SPENT
₹41.51 L spent
of ₹57.76 L sanctioned
₹16.26 L still to spend
on 52 ongoing works
Works ongoing
52
Open the list of these works →
Sanctioned
₹57.76 L
Pure scheme (wage + material)
Expenditure since inception
₹41.51 L
71.9% of sanction
Balance cost (unspent)
₹16.26 L
Wage₹12.37 L
Material₹3.89 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type