Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
60.8%
OF COST SPENT
₹8.50 Cr spent
of ₹13.98 Cr sanctioned
₹5.48 Cr still to spend
on 139 ongoing works
Works ongoing
139
Open the list of these works →
Sanctioned
₹13.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.50 Cr
60.8% of sanction
Balance cost (unspent)
₹5.48 Cr
Wage₹2.88 Cr
Material₹2.60 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore