Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
80.8%
OF COST SPENT
₹1.17 Cr spent
of ₹1.45 Cr sanctioned
₹27.81 L still to spend
on 17 ongoing works
Works ongoing
17
Open the list of these works →
Sanctioned
₹1.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.17 Cr
80.8% of sanction
Balance cost (unspent)
₹27.81 L
Wage₹17.73 L
Material₹10.08 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type