Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Bund
37.9%
OF COST SPENT
₹1.38 Cr spent
of ₹3.65 Cr sanctioned
₹2.27 Cr still to spend
on 79 ongoing works
Works ongoing
79
Open the list of these works →
Sanctioned
₹3.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.38 Cr
37.9% of sanction
Balance cost (unspent)
₹2.27 Cr
Wage₹1.37 Cr
Material₹90.01 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore