Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
17.9%
OF COST SPENT
₹3.66 L spent
of ₹20.45 L sanctioned
₹16.80 L still to spend
on 6 ongoing works
Works ongoing
6
Open the list of these works →
Sanctioned
₹20.45 L
Pure scheme (wage + material)
Expenditure since inception
₹3.66 L
17.9% of sanction
Balance cost (unspent)
₹16.80 L
Wage₹13.89 L
Material₹2.90 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh