Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Percolation Tank
3.5%
OF COST SPENT
₹21.25 L spent
of ₹6.01 Cr sanctioned
₹5.80 Cr still to spend
on 93 ongoing works
Works ongoing
93
Open the list of these works →
Sanctioned
₹6.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.25 L
3.5% of sanction
Balance cost (unspent)
₹5.80 Cr
Wage₹3.52 Cr
Material₹2.27 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown